Value chain · CLM-0522
In plain terms
The UK study used a 20% return requirement, based on what institutional investors are expected to want. The US study used 3%, on a one-line assumption of government funding, and did not test what a different rate would do.
The claim as recorded
Frazer-Nash's 20% LCOE hurdle rate is based on "the projected hurdle rate required by institutional investors", an assumption "agreed after extensive discussion", not a market-observed figure; NASA OTPS's 3% rests on one sentence, "We do not consider the rate on return of equity in our calculations for example, as our baseline scenario assumes Government financing", and is not varied anywhere in the report's own sensitivity analysis.
Evidence behind this: T4 (SRC-021); T3 (SRC-012)
Scope and limits
Neither rate is empirically derived from an observed transaction; both are stated assumptions.
What it assumes
No assumptions are recorded against this claim.
Where it comes from
Quoted in full at claims.md ~4993 and ~5178. "The discount rate used to account for the costs of capital and risks in the project is based on the projected hurdle rate required by institutional investors. This assumption was agreed after extensive discussion as suitable to provide balanced comparisons with other technologies." (SRC-019 Annex B, p.5, verbatim) SRC-012 printed p.56 / PDF p.73, verbatim: "We do not consider the rate on return of equity in our calculations for example, as our baseline scenario assumes Government financing."
Basis: discount rate, percent, LCOE calculation basis
Related records
- Answers question
- QST-039 not published in this release
Cite this
energyaperture.com/c/clm-0522
CLM-0522, Energy Aperture, as of 2021; 2024.
Connected records
Other published records linked to this one. A list, not a judgement.
- Also from SRC-012
- CLM-0006None of the five main studies mentions the international radio-frequency exposure limits, or any safety standard, or a restricted area...CLM-0123NASA's own 2024 study puts space solar power at 12 to 80 times the cost it expects in 2050 from power stations on the ground, a set it...CLM-0124NASA also found that if several things improve at once, rather than just one, space solar power does become cost competitive.CLM-0125On carbon, NASA found space solar power within the range of five renewable ways of making power on the ground (wind, solar, solar thermal...CLM-0144A NASA study found that launching everything into space is by far the biggest cost of a space solar power system, and that most of those...CLM-0192The full list of assumptions behind the headline result of NASA's 2024 study, that space solar power would cost far more than ground...CLM-0193To get to a competitive cost, NASA's own 2024 analysis needs launch costs to halve, solar cells to get much more efficient, satellites to...CLM-0240A from-scratch cost model of the "Innovative Heliostat Swarm" design gets almost the same electricity cost as NASA's own study: about 62...More on the source page.
- Also from SRC-019
- CLM-0172The study uses a high assumed rate of return (20%) to work out the headline cost-per-unit-of-electricity figure, but uses a much lower...CLM-0176The launch-cost range that drives most of this study's cost uncertainty is not based on any launch that has actually happened - for...CLM-0177The cost model assumes the satellite gets cheaper to build the more of them are made, using a range that runs from the faster cost-learning...CLM-0531Neither the UK nor the US figure for what it costs to get a kilogram of hardware into the power station's real orbit is based on an actual...CLM-0539A UK consultancy, working for the European Space Agency and using the same design as its reference point, actually published a full weight...CLM-0714The 2021 UK study by Frazer-Nash Consultancy proposed that the satellite fly itself to its final orbit, using its own solar panels to run...CLM-0715The 2021 UK study assumed one extra fuel launch for every payload launch; NASA's 2024 study assumed twelve. The reason, which neither study...CLM-1430Put in 2024 money, a reliable British grid built on wind, sun and stored hydrogen would cost about 61 to 107 pounds per megawatt-hour in...More on the source page.
- Also from SRC-021
- CLM-0170A UK government-commissioned study estimates the cost of electricity from a mature (fifth-built) space solar power satellite at roughly 3.5...CLM-0171The same model shows the cost of electricity is noticeably higher for the first unit built than for the fifth, and when this study compares...CLM-0172The study uses a high assumed rate of return (20%) to work out the headline cost-per-unit-of-electricity figure, but uses a much lower...CLM-0173Developing a working space solar power system for the UK is estimated to cost somewhere between about 7.5 and 16 billion pounds (in 2021...CLM-0174On the study's own numbers, a first space solar power system would not, by itself, earn investors the return they would expect (20%) - it...CLM-0175For every pound of public money put into the whole programme, the study estimates the UK economy gets back between GBP 1.30 and GBP 1.80...CLM-0538The US and UK studies are not just using different toughness levels for the same test -- they are answering different questions. The US...CLM-0714The 2021 UK study by Frazer-Nash Consultancy proposed that the satellite fly itself to its final orbit, using its own solar panels to run...More on the source page.