The value chain
Every record in this base is tagged to at least one of these 17 layers. The Target and Reached columns show how deep each layer should go and how deep the evidence currently goes.
Depth runs L0 to L3. L0 names the layer. L1 names its top three constraints with units. L2 reproduces the governing relationship and its input ranges. L3 adds an independent order-of-magnitude calculation and says where a published figure differs from it and why. The full scale.
1 of 17 layers sit below their declared target. Target is how deep a layer should go. Reached is how deep the evidence goes now.
| Layer | Covers | Target | Reached | Records |
|---|---|---|---|---|
| VC01 Solar collection and conversion | Cells, concentrators, optics, thermal conversion, degradation, sun pointing of the collector | L2 | L2 | 37 |
| VC02 Satellite power management and distribution | DC bus, conversion, cabling, protection, harness mass, on-board storage | L3 | L3 | 16 |
| VC03 Thermal management | Waste heat paths, radiators, radiator area and mass, operating temperature limits | L2 | L2 | 10 |
| VC04 Platform structure, deployment and control | Primary structure, deployables, attitude control, station keeping, orbit maintenance, propellant | L3 | L3 | 73 |
| VC05 Transmitter: DC to beam and aperture | DC to RF or DC to optical conversion, amplifiers, phase control, beam forming, transmit aperture | L3 | L3 | 106 |
| VC06 Beam link and propagation | Link budget, diffraction and beam geometry, atmospheric effects, pointing accuracy and safety, frequency choice and beam power density | L3 | L3 | 344 |
| VC07 Ground receiver and rectification | Rectenna or optical receiver, RF or light to DC conversion, receiver site, land area, civil works, co-use of land | L3 | L3 | 127 |
| VC08 Ground power conversion and grid interface | DC to AC conversion, transformers, protection, harmonics, fault ride-through, grid code compliance, the connection asset | L3 | L3 | 34 |
| VC09 Grid integration and system value | Dispatchability, firmness, capacity value, balancing, curtailment, the comparator basket, offtake and market position | L3 | L3 | 65 |
| VC10 Launch and orbital transport | Launch price per kg, cadence, fairing and mass constraints, orbit choice and transfer, launch availability | L3 | L3 | 86 |
| VC11 In-space assembly and servicing | Autonomous and robotic assembly, docking, alignment of large apertures, in-space manufacture, on-orbit repair and replacement | L3 | L3 | 49 |
| VC12 Operations, availability and end of life | Ground segment operations, availability and outage, degradation over life, disposal, deorbit, debris generation by the system itself | L2 | L2 | 18 |
| XC01 Regulation, spectrum and law | Spectrum allocation and coordination, exposure limits, aviation, licensing, planning, liability, treaty and property questions | L3 | L3 | 180 |
| XC02 Economics and finance | LCOE, capex, opex, learning rates, discount rates, financing, insurance, subsidy, first-unit funding | L3 | L3 | 291 |
| XC03 Environment and lifecycle impact | Lifecycle greenhouse gas, launch emissions, land and ecological effects, atmospheric effects, the shared debris environment | L3 | L2 | 173 |
| XC04 Security, defence and resilience | Dual use, attack surface, jamming and interference, physical vulnerability, energy security, supply chain security | L2 | L2 | 49 |
| XC05 Supply chain, industrial base and skills | Materials and critical inputs, manufacturing capacity and rate, qualification routes, standards, workforce and skills demand | L1 | L1 | 31 |
The record count is every record tagged to that layer, not the number published. Most records in this base are not published, and why is worth reading before drawing conclusions from these counts.