In plain terms

The cost model assumes the satellite gets cheaper to build the more of them are made, using a range that runs from the faster cost-learning of a 2010s space-industry estimate (Mankins) down to the slower cost-learning the study estimates for SpaceX's Starlink constellation; separately, it assumes the system generates power 100% of the time with zero downtime, which the study's own authors call optimistic.

The claim as recorded

The Frazer-Nash cost model assumes a triangular-distributed learning exponent for mass-production cost reduction of -0.73 to -0.24 (mode -0.58), based on John Mankins' estimate that SPS satellite cost/kg falls to 67% of the prior value for each doubling of production volume (a roughly 33% learning rate) at the mode, bounded above by the document's estimate that the mass-produced Starlink constellation reduces to 85% of cost per doubling (a roughly 15% learning rate), which is the SLOWEST learning in the range and therefore its least optimistic end; separately, the model's "Load Factor" (capacity factor) is fixed at a constant value of 1 (i.e. 100%), which the same document describes as "a design assumption" that "is slightly optimistic, as there will be some downtime for shadowing by the Earth and maintenance, but these are likely to be relatively small".

Scope and limits

Capacity factor is not empirically demonstrated for any GEO SBSP design; it is a stated simplification. The learning-rate range spans a very wide band (15%-33%+ per doubling) which is itself a major source of the LCOE uncertainty shown in CLM-0170. The 85% Starlink figure cannot be traced within the document: its citation [44] resolves in the bibliography (p.15) to a 1997 US patent on re-orbiting a geostationary spacecraft, and the only Starlink item in the bibliography ([23], p.14) concerns the user terminal.

What it assumes

SPS module manufacturing follows an industrial learning curve comparable to either aerospace (Mankins) or satellite mega-constellation (Starlink) production; capacity factor of 100% is achievable or near-achievable for the specific orbit/design chosen.

Where it comes from

SRC-019 Space Based Solar Power as a Contributor to Net Zero - Phase 2: Economic Feasibility - Annex B:...
"John Mankins has estimated that the cost/kg of SPS satellites reduce to 67% of the original cost for each doubling of production volume" (PDF p.8; the page then gives 2^fLC = 0.67, so fLC = -0.58). "A range of remaining costs after a volume doubling of 60-70% is given" (same page), "leading to fLC of -0.51 to -0.73." "The mass-produced Starlink constellation is estimated to reduce to 85% of cost each doubling of production" (same page), "leading to fLC of -0.24." Table B1 gives the Learning Exponent as a Triangle distribution: -0.73 / -0.58 / -0.24 (p.8, p.4). "Load Factor... Constant... 1" and "Load factor is a design assumption. This is slightly optimistic, as there will be some downtime for shadowing by the Earth and maintenance, but these are likely to be relatively small" (Table B1 row p.3; justification p.6).

Basis: dimensionless (learning exponent / capacity factor), 2021 vintage

Related records
Answers question
QST-041 not published in this release

Cite this

energyaperture.com/c/clm-0177

CLM-0177, Energy Aperture, as of 2021.

Connected records

Other published records linked to this one. A list, not a judgement.

Also from SRC-019
CLM-0172The study uses a high assumed rate of return (20%) to work out the headline cost-per-unit-of-electricity figure, but uses a much lower...
CLM-0176The launch-cost range that drives most of this study's cost uncertainty is not based on any launch that has actually happened - for...
CLM-0522The UK study used a 20% return requirement, based on what institutional investors are expected to want. The US study used 3%, on a one-line...
CLM-0531Neither the UK nor the US figure for what it costs to get a kilogram of hardware into the power station's real orbit is based on an actual...
CLM-0539A UK consultancy, working for the European Space Agency and using the same design as its reference point, actually published a full weight...
CLM-0714The 2021 UK study by Frazer-Nash Consultancy proposed that the satellite fly itself to its final orbit, using its own solar panels to run...
CLM-0715The 2021 UK study assumed one extra fuel launch for every payload launch; NASA's 2024 study assumed twelve. The reason, which neither study...
CLM-1430Put in 2024 money, a reliable British grid built on wind, sun and stored hydrogen would cost about 61 to 107 pounds per megawatt-hour in...
More on the source page.
Cited in articles