In plain terms

Any UK ground receiving station that wants to connect to the electricity grid must be able to supply or absorb a type of power called reactive power, under an existing UK grid rule.

The claim as recorded

Obtaining a grid connection in Great Britain requires the ability to provide or absorb reactive power, a requirement known as the Obligatory Reactive Power Service (ORPS), which the report states would apply to any GB-based rectenna seeking a grid connection.

Scope and limits

This establishes that the requirement exists and would apply; it does not establish that any specific rectenna design meets it, nor does it say anything about grid-code requirements outside Great Britain.

What it assumes

A UK rectenna would be treated as a conventional grid-connected generator for the purposes of GB connection codes, with no SBSP-specific exemption.

Where it comes from

SRC-076 RAF036/2425: Feasibility of Small-Scale Space Based Solar Power Systems for Early Market...
p.34: "The ability to provide or absorb reactive power is a requirement of obtaining a grid connection. This is known as the Obligatory Reactive Power Service (ORPS). How often this is required, and the quantities involved are strongly locationally dependent." Confirmed verbatim against the PDF text layer.

Basis: Great Britain grid-code requirement, as described for a rectenna grid connection

Related records
Answers question
QST-002 not published in this release

Cite this

energyaperture.com/c/clm-0215

CLM-0215, Energy Aperture, as of 2025.

Connected records

Other published records linked to this one. A list, not a judgement.

Also from SRC-076
CLM-0018The most recent UK government report calls 230 watts per square metre a limit to be reached because it lowers cost, and cites an earlier...
CLM-0019The report sets out Space Solar's plan: a small in-orbit test, then 31 megawatts in 2030, 150 megawatts in 2033, and 650 megawatts in...
CLM-0152Two UK industry planning documents, from 2022 and 2025, each state a beam-intensity design figure in the 230-245 watts-per-square-metre...
CLM-0213The study assumes that connecting a ground receiving site to the electricity grid costs about GBP 150,000 for every megawatt of power the...
CLM-0214Six different solar-power-satellite designs each claim that turning the electricity collected on the ground into grid-ready power is 90 to...
CLM-0216The UK's fast-response grid support services need a generator to react within seconds, at any moment over a 4-hour period. A ground...
CLM-0503Under the international radio rules as revised at the 2023 world radio conference, there is no radio-frequency allocation for beaming power...
CLM-0517Every date in the plan -- the ground demo (2026), the demo mission (2027-28), 2030, 2033 and 2036 -- is a hope, not a booking, and the...
More on the source page.