The study assumes that connecting a ground receiving site to the electricity grid costs about GBP 150,000 for every megawatt of power the site handles.

The claim as recorded

A 2025 UK-government-commissioned feasibility study assumes the cost of grid connection equipment ("site grid infrastructure") at a rectenna site scales linearly with constellation power output at GBP 0.15 million per MW (2024 prices), giving an estimated total cost per constellation of GBP 18.6 million in 2030, GBP 25.5 million in 2035, and GBP 31.2 million in 2040.

Scope and limits

This is a planning-level cost ASSUMPTION for a specific UK small-scale reference design (based on CASSIOPeiA/Space Solar), not a quoted, tendered, or achieved grid-connection cost, and not necessarily representative of grid-connection costs outside Great Britain.

What it assumes

Linear scaling of grid-connection cost with power output holds across the 52 MW to several-hundred-MW range modelled; no step-change costs (e.g. new substation build) are triggered within that range.

Where it comes from

SRC-076 RAF036/2425: Feasibility of Small-Scale Space Based Solar Power Systems for Early Market...
p.70: "Site grid infrastructure is the cost of the electricity plant and grid connection equipment required at the rectenna. The cost of site grid infrastructure scales with the power output of the constellation. In 2024 prices, the cost is assumed to be £0.15 million per MW. The total cost per constellation is estimated as follows: 2030 - £18.6 million. 2035 - £25.5 million. 2040 - £31.2 million." Confirmed verbatim against the PDF text layer.

Basis: 2024 GBP, per MW of constellation power output, small-scale SBSP economic model

Related records
Answers question
QST-002 not published in this release
Contradicts
CLM-0781 not published in this release
CLM-0784 not published in this release

Cite this

energyaperture.com/c/clm-0213

CLM-0213, Energy Aperture, as of 2025.

Connected records

Other published records linked to this one. A list, not a judgement.

Also from SRC-076
CLM-0018The most recent UK government report calls 230 watts per square metre a limit to be reached because it lowers cost, and cites an earlier...
CLM-0019The report sets out Space Solar's plan: a small in-orbit test, then 31 megawatts in 2030, 150 megawatts in 2033, and 650 megawatts in...
CLM-0152Two UK industry planning documents, from 2022 and 2025, each state a beam-intensity design figure in the 230-245 watts-per-square-metre...
CLM-0214Six different solar-power-satellite designs each claim that turning the electricity collected on the ground into grid-ready power is 90 to...
CLM-0215Any UK ground receiving station that wants to connect to the electricity grid must be able to supply or absorb a type of power called...
CLM-0216The UK's fast-response grid support services need a generator to react within seconds, at any moment over a 4-hour period. A ground...
CLM-0503Under the international radio rules as revised at the 2023 world radio conference, there is no radio-frequency allocation for beaming power...
CLM-0517Every date in the plan -- the ground demo (2026), the demo mission (2027-28), 2030, 2033 and 2036 -- is a hope, not a booking, and the...
More on the source page.