In plain terms

The report sets out Space Solar's plan: a small in-orbit test, then 31 megawatts in 2030, 150 megawatts in 2033, and 650 megawatts in geostationary orbit in 2036.

The claim as recorded

RAF036/2425 sets out a Space Solar CASSIOPeiA roadmap of an in-orbit demonstration testing power beaming and structural truss assembly at kilowatt scale, then in 2030 a minimum viable product of 31 MW from HEO, in 2033 a 150 MW system from the same HEO orbit, and in 2036 a first GEO system of 650 MW.

Scope and limits

The report's own footnote 29 states, verbatim: "Estimated timescales only. Actual timescales are subject to availability of funding, regulatory requirements and technological developments". These are stated intentions in forward band B2, not contracted schedules. They may only be reported as declared targets, with the date they were declared. Six-month review because PROGRAMME claims age fast.

What it assumes

No assumptions are recorded against this claim.

Where it comes from

SRC-076 RAF036/2425: Feasibility of Small-Scale Space Based Solar Power Systems for Early Market...
Verbatim, p29: "In 2030, the MVP is forecast to launch, providing 31 MW of power from HEO. ... In 2033, a larger system is planned to launch, providing 150 MW of power from the same HEO orbit. ... In 2036, the first GEO system is forecast to launch, providing 650 MW of power."
Related records
Answers question
QST-001 not published in this release

Cite this

energyaperture.com/c/clm-0019

CLM-0019, Energy Aperture, as of 2025.

Connected records

Other published records linked to this one. A list, not a judgement.

Also from SRC-076
CLM-0018The most recent UK government report calls 230 watts per square metre a limit to be reached because it lowers cost, and cites an earlier...
CLM-0152Two UK industry planning documents, from 2022 and 2025, each state a beam-intensity design figure in the 230-245 watts-per-square-metre...
CLM-0213The study assumes that connecting a ground receiving site to the electricity grid costs about GBP 150,000 for every megawatt of power the...
CLM-0214Six different solar-power-satellite designs each claim that turning the electricity collected on the ground into grid-ready power is 90 to...
CLM-0215Any UK ground receiving station that wants to connect to the electricity grid must be able to supply or absorb a type of power called...
CLM-0216The UK's fast-response grid support services need a generator to react within seconds, at any moment over a 4-hour period. A ground...
CLM-0503Under the international radio rules as revised at the 2023 world radio conference, there is no radio-frequency allocation for beaming power...
CLM-0517Every date in the plan -- the ground demo (2026), the demo mission (2027-28), 2030, 2033 and 2036 -- is a hope, not a booking, and the...
More on the source page.