In plain terms

The 2022 European study assumed it takes two years to build a satellite in orbit, and that getting parts launched could be the thing that makes it take longer.

The claim as recorded

The 2022 ESA/Frazer-Nash cost-benefit study assumes the satellite is constructed over 2 years, states that the construction period may be constrained by available launch capacity, and models sufficient orbital assembly capacity to support that period without stating what that capacity is.

Evidence behind this: T4-commissioned-study, a modelling assumption stated as such.

Scope and limits

NO RATE IS GIVEN - THE ASSEMBLY CAPACITY IS "SUFFICIENT" BY CONSTRUCTION OF THE MODEL. The only modern held source with a construction duration, and it is four times the 1978 figure for a smaller system, which is itself a finding.

What it assumes

A modelling assumption, stated as such.

Where it comes from

SRC-078 Study on Cost-Benefit Analysis of Space-Based Solar Power Generation for Terrestrial Energy...
Verbatim from the held text: "Construction duration The system will be constructed over 2 years. Series manufacture and autonomous in-orbit assembly are key outputs of the development programme and the focus will be to drive down the construction time. Provision is made in the model for sufficient orbital assembly capacity to support this construction period. The construction period may be constrained by the available space launch capacity."

Basis: construction duration, years

Related records
Answers question
QST-015 not published in this release

Cite this

energyaperture.com/c/clm-0967

CLM-0967, Energy Aperture, as of 2022-07.

Connected records

Other published records linked to this one. A list, not a judgement.

Also from SRC-078
CLM-0152Two UK industry planning documents, from 2022 and 2025, each state a beam-intensity design figure in the 230-245 watts-per-square-metre...
CLM-0189A separate 2022 study for the European Space Agency, by Frazer-Nash and London Economics, estimates the cost of electricity from a first...
CLM-0190This European study finds that a full Europe-wide space solar power programme would cost about 418 billion euros in today's money but...
CLM-0191This 2022 report is one of two parallel studies the European Space Agency commissioned on the costs and benefits of space solar power: this...
CLM-0280A 2022 ESA-commissioned study modelled that the first European space solar power satellite could produce electricity at a cost of 106 to...
CLM-0281The study tested how much the cost of launching material into space changes the price of space solar power. It used launch-cost data from...
CLM-0282A 2022 ESA-commissioned study modelled that, from 2022 to 2070, space solar power for Europe could deliver a net economic benefit of about...
CLM-0539A UK consultancy, working for the European Space Agency and using the same design as its reference point, actually published a full weight...
More on the source page.