SRC-155
Electricity Generation Costs 2025, Annex A: additional estimates and key assumptions.
UK Department for Energy Security and Net Zero (DESNZ) ·2026 · T3 government or agency report · XC02
Commissioned by UK Government. Who paid for a study is recorded because it bears on how its conclusions should be read, not because it makes them wrong.
Published claims resting on this source
- CLM-0270 DESNZ estimated in its 2025 report that a new large solar farm built in the UK and commissioned in 2030 would generate power at about 60 pounds per megawatt-hour (6 pence per kilowatt-hour), and one commissioned in 2050 at about 49 pounds. Onshore wind is estimated at a similar cost; offshore wind is estimated at roughly double the cost of solar or onshore wind. These figures do not include the cost of storing power or balancing the grid.
- CLM-0271 DESNZ estimated that a new gas power station in the UK, run almost continuously, would generate power at about 111-112 pounds per megawatt-hour (about 11 pence per kilowatt-hour), whether commissioned in 2030 or 2050. A gas plant with carbon capture, run the same way, is estimated slightly cheaper. These are the closest dispatchable, always-available comparators in this report; they are gas-fired, not firmed renewables.
- CLM-0544 The UK government's own cost model expects deep geothermal power, which it treats as an early-stage technology, to become much cheaper by 2050 than a first-of-a-kind plant would be in 2030.
Cite this
energyaperture.com/s/src-155
SRC-155 , recorded 2026-09-03.