SRC-782
Whole-system cost of variable renewables in future GB electricity system, October 2016
Imperial College London; Goran Strbac and Marko Aunedi (as printed on PDF p.2) ·2016 · T4 commissioned study or industry paper · VC09XC02
Commissioned by Joint industry project with RWE Innogy, Renewable Energy Systems and ScottishPower Renewables (title page). Who paid for a study is recorded because it bears on how its conclusions should be read, not because it makes them wrong.
Published claims resting on this source
- CLM-1421 A 2016 Imperial College study run jointly with three renewable-energy companies found that adding wind to Britain's grid in 2030 would bring extra system costs of about 5 to 9 pounds for each megawatt-hour the wind farms produce, compared with adding nuclear, if the grid has a fair amount of storage and other flexibility. Most of that extra cost is back-up power stations for windless periods.
- CLM-1422 Imperial College found that the extra system cost of wind and solar in Britain in 2030 depends heavily on how flexible the grid is: about 40 to 48 pounds per megawatt-hour of their output with no new storage or demand response, but about 5 to 17 pounds once those are added. The figures are measured against nuclear power, not counted from zero.