Energy Aperture

Value chain · CLM-1107

In plain terms

The actual Grid Code figure is not a flat 0.95 power factor at all voltages: the plant must push reactive power out when the grid voltage sags towards 0.9 and absorb it when the voltage rises towards 1.1, and full capability both ways is only demanded in a narrow band around nominal. At part load the requirement is a third of rated power either way, easing on the absorbing side below half load.

The claim as recorded

For an Onshore Type C or Type D Power Park Module connecting above 33 kV, the Grid Code's reactive capability at Maximum Capacity is Figure ECC.6.3.2.4(a), a tilted band of Grid Entry Point voltage against power factor: at unity power factor the module must operate from 0.95 to 1.05 pu; at 0.95 lag (exporting MVAr) from about 0.875 to 0.9 pu up to about 1.03 pu; at 0.95 lead (absorbing) from about 0.97 pu up to 1.05 pu, the envelope reaching about 1.1 pu just inside full lead. Below Maximum Capacity, Figure ECC.6.3.2.4(c) requires Q/Pmax of -0.33 to +0.33 from 0.2 to 1.0 pu active power, the absorbing limit reducing linearly from -0.33 at 0.5 pu to -0.12 at 0.2 pu unless The Company specifies otherwise, with a +/-0.05 band below 0.2 pu. The 0.33 is tan(acos 0.95). A module connecting to a Non Embedded Customer's system "may be required to meet additional reactive compensation requirements at the point of connection" for System reasons.

T1 measured result, peer reviewed · high confidence · as of 2026-06 · VER-1376 CONFIRMED 2026-09-20 · VC08

Evidence behind this: T1-the code text and its figures read directly, replacing the guidance-derived CLM-0783 for the Type D case.

Scope and limits

The vertex voltages of Figure (a) are read from a schematic figure with no printed values at the vertices: the bottom vertex is drawn between the 0.9 and 0.875 gridlines and the top just above 1.1, both with grey dashed extensions to 0.875 and 1.1, so "about" is deliberate and a reader needing the exact vertex should take the figure itself. Figure (b) (at or below 33 kV) is not the SBSP case and is not stated here. Nothing here bears on whether a rectenna converter fleet can meet the envelope; CLM-0784's MVAr arithmetic used the flat 0.95 reading, and the figure asks for that 0.95 lag capability down to about 0.9 pu, where the same MVAr means about 11 per cent more current, a point for CLM-0784's successor rather than a correction here.

What it assumes

No assumptions are recorded against this claim.

Where it comes from

SRC-452 The Serviced Grid Code, Issue 6 Revision 41, effective 5 June 2026 - the revision pack carrying...
PDF p.223, normalised: "shall be capable of satisfying the Reactive Power capability requirements at the Grid Entry Point or User System Entry Point" ... "as defined in Figure ECC.6.3.2.4(a) when operating at Maximum Capacity"; "may be required to meet additional reactive compensation requirements at the point of connection between the System and the Non Embedded Customer or private network where this is required for System reasons". Figure (a) read from crop p0224-fig-ecc-6-3-2-4a-reactive-envelope.png (the figure has no text layer; its labels are render readings): gridlines 1.1, 1.05, 1.0, 0.95, 0.9, 0.875; x axis -0.95 "Consumption (lead)", 1, 0.95 "Production (lag)"; bracket "0.225". Figure (c) from crop p0225-fig-ecc-6-3-2-4c-reactive-below-max.png (no text layer; labels are render readings): ticks -0.33, -0.12, -0.05, 0, 0.05, 0.33 on "Q/Pmax"; 0.2, 0.5, 1.0 on "Power (p.u)". p.225, normalised: "With all Plant in service, the Reactive Power limits will reduce linearly below 50% Active Power output as shown in Figure ECC.6.3.2.4(c) unless the requirement to maintain the Reactive Power limits defined at Maximum Capacity" ... "under absorbing Reactive Power conditions down to 20% Active Power output has been specified by The Company". Arithmetic: tan(acos 0.95) = 0.3287; 1.1 - 0.875 = 0.225.

Basis: per-unit voltage at the Grid Entry Point against power factor at Maximum Capacity; Q/Pmax against per-unit power below it

Related records
Answers question
QST-012 not published in this release

Cite this

energyaperture.com/c/clm-1107

CLM-1107, Energy Aperture, as of 2026-06.

Connected records

Other published records linked to this one. A list, not a judgement.

Also from SRC-452
CLM-1108After the first 140 milliseconds, the rule is a line on a chart: the lower the grid voltage sags, the shorter the time the plant must hold...
CLM-1109The rulebook says the same as the guidance: nobody has to make their inverters behave like a rotating machine, but the grid needs enough...
CLM-1210Britain's grid runs at 50 Hz, normally kept between 49.5 and 50.5 Hz. A power station connected to it, which would include a rectenna, must...
CLM-1211Britain's main transmission grid runs at 400 kV and 275 kV, and parts of the 132 kV network in Scotland. On the 400 kV network the voltage...