In plain terms

A major financial advisory firm's own widely-used LCOE report says plainly that its numbers do not cover intermittency or total system cost.

The claim as recorded

Lazard states of its own LCOE+ analysis that it "does not consider the intermittent nature of selected renewable energy technologies or the related grid impacts of incremental renewable energy deployment," that it is "a cost-focused benchmarking tool, and not a planning tool or total system-cost analysis," and lists explicitly, in a published table, that it does not say "what total system costs are for 1 MWh of incremental electricity."

Scope and limits

Every page of the source PDF carries a "CONFIDENTIAL" template header; this is recorded as Lazard's standard boilerplate on its annual public release (obtained with no login from Lazard's own public research-insights page), consistent with every prior LCOE+ edition, but is flagged here in case that judgement needs revisiting.

What it assumes

No assumptions are recorded against this claim.

Where it comes from

SRC-146 Levelized Cost of Energy+ 2026, incorporating Levelized Cost of Energy Analysis Version 19.0...
PSRC-03 p.6: "Except as illustratively sensitized herein, this analysis does not consider the intermittent nature of selected renewable energy technologies or the related grid impacts of incremental renewable energy deployment." p.16: "Lazard's LCOE is a cost-focused benchmarking tool, and not a planning tool or total system-cost analysis." p.43, "Does Not Say" column: "What total system costs are for 1 MWh of incremental electricity."
Related records
Answers question
QST-021 not published in this release

Cite this

energyaperture.com/c/clm-0303

CLM-0303, Energy Aperture, as of 2026-07.

Connected records

Other published records linked to this one. A list, not a judgement.

Also from SRC-146
CLM-0263A widely used financial-industry cost report estimates 2026 U.S. power costs, without subsidy, as follows: utility solar 40-98 dollars per...
CLM-0265The same report assumes, by default, that a power project is financed 60 percent by debt (at 8 percent interest) and 40 percent by equity...
CLM-0266The report itself warns that its main headline cost figures leave out the wider costs of running a reliable power grid, things like power...
CLM-0300The main international definition of LCOE is the flat price per unit of electricity a power plant would need to be paid, every year of its...
CLM-0312A major financial advisory firm has estimated, using US grid operators' own published figures, what it adds to the cost of wind or solar to...
CLM-0470The same financial-industry report separately estimates what it costs to make solar and wind power as reliable as an always-on power plant...
CLM-0524Every UK-specific or typical-country cost-of-capital figure found sits well below the 20% rate Frazer-Nash used, even at the top of DESNZ's...
Cited in articles