Value chain · CLM-0301

In plain terms

The IEA itself says plain LCOE misses how useful a power plant is to the wider electricity system, which is why it built a second, add-on metric.

The claim as recorded

IEA and the OECD Nuclear Energy Agency state in their own methodology that LCOE "is not a complete metric of competitiveness, as it lacks representation of the value provided to the system," and that in systems with large shares of variable renewables "one must complement cost considerations with value considerations, or, equivalently, account for costs at the system rather than at the plant level," which is the stated reason they built VALCOE as a supplementary metric.

Scope and limits

A methodological statement by the metric's own publisher, not a technology-specific finding. It does not by itself say by how much any technology's standing changes; see section 3 of this note for the sizes found.

What it assumes

No assumptions are recorded against this claim.

Where it comes from

SRC-161 Projected Costs of Generating Electricity, 2020 edition, 2020
PSRC-01 p.33 quoted above; p.75: "the LCOE is not a complete metric of competitiveness, as it lacks representation of the value provided to the system. Power generation technologies primarily generate electricity (or energy) but also provide other services that are critical to the adequacy, reliability and quality of electricity supply."
Related records
Answers question
QST-021 not published in this release

Cite this

energyaperture.com/c/clm-0301

CLM-0301, Energy Aperture, as of 2020-12.

Connected records

Other published records linked to this one. A list, not a judgement.

Also from SRC-161
CLM-0300The main international definition of LCOE is the flat price per unit of electricity a power plant would need to be paid, every year of its...
CLM-0304The interest rate assumed changes an LCOE figure a lot, and most for plants that cost the most to build: in a 2020 international study...
CLM-0305How long a power plant is assumed to last matters much less to its cost per unit of electricity than the interest rate does.
CLM-0308The IEA's alternative metric adds credit for how much a power plant helps keep the grid reliable, on top of its raw energy cost, but the...