SRC-439
Preliminary Study: Electromagnetic Compatibility, Tropospheric and Ionospheric Aspects of SPS MPTS Operations
US Department of Commerce, Office of Telecommunications, Institute for Telecommunication Sciences, Applied Electromagnetic Science Division, Boulder CO ·1978-03 · T3 government or agency report · VC06XC01
Commissioned by Prepared for Pacific Northwest Laboratory under DOC-DOE Interagency Agreement EW-78-I-06-1071. Who paid for a study is recorded because it bears on how its conclusions should be read, not because it makes them wrong.
PNL-2616, UC-97a (from the OSTI record, not read from the document); DOI 10.2172/5154689; OSTI 5154689 the identifier this document is registered under
Published claims resting on this source
- CLM-0927 The 1978 review found an interference route the report it was reviewing never considered: the power beam bouncing off rain, hail or blown sand into a ground microwave receiver that happens to share the frequency. It calculated the result and found it far above what international rules permit as unwanted signal. It also picked out the third harmonic, at 7350 megahertz, as the one most likely to cause trouble, because it lands in a government satellite band.
- CLM-0960 The 1975 study found the satellite's harmonics - the multiples of its transmit frequency - would trouble radio astronomy at the second and third harmonic, would trouble ordinary radio only at the klystron's second harmonic unless a filter was added, and would be clear at the fourth. A later reading of a redrawn chart says all three harmonics exceed everything. The original does not say that.
Cite this
energyaperture.com/s/src-439
SRC-439 , recorded 2026-09-11.