Value chain · CLM-0017
In plain terms
One author, writing in an unpublished draft, says the exposure guideline must be met outside the receiving site, and that what applies inside the site is still under discussion.
The claim as recorded
Shinohara states that a future power transmission system must meet the safety guideline outside the rectenna site, and that inside the site there remains discussion concerning the keep-out area and whether it is a controlled or uncontrolled area.
Scope and limits
One author's characterisation of the state of discussion in the field, in an undated draft. Not a regulatory position and not a standard.
What it assumes
No assumptions are recorded against this claim.
Where it comes from
Verbatim: "In future MPT system, we have to keep the safety guideline outside of a rectenna site. Inside the rectenna site, there remains discussion concerning the keep out area, controlled or uncontrolled area."
Related records
- Answers question
- QST-001 not published in this release
Cite this
energyaperture.com/c/clm-0017
CLM-0017, Energy Aperture, as of unknown.
Connected records
Other published records linked to this one. A list, not a judgement.